Current Construction Projects
When passing any vehicle with flashing lights on the side of a road, Ohio’s Move Over Law requires motorists to cautiously shift over one lane — or slow down if changing lanes is not possible. The law's purpose is to protect everyone who works on and travels our roads in the State of Ohio. Browse ODOT Move Over page to learn more.
If you experience an incident in a construction zone, fill out and return this form to our office, via email or hard-copy. If you have any quotes for the repairs or pictures of the damage, please include those as well. After we receive these items we will then forward your information to the City’s Contractor for review of the claim. The contractor or their insurance company will reach out to you directly. If they do not reach out to you in a timely manner or you feel as though you need additional information or assistance please reach out to us at 440-617-4145.
Dover Center Road resurfacing project
Specialized Construction has begun the first of two phases for the Dover Center Road resurfacing project. Drivers should reference the planned detours for each phase shown below. Phase 1 will cover from Lorain Road north to Detroit Road. Phase 2 will cover from Detroit Road to the railroad tracks along the border between Westlake and Bay Village. All traffic will be maintained in a southbound direction and northbound traffic will be detoured throughout the project.
Westlake proposes to complete reconfiguration of I-90/SR 252 (Columbia Road) Interchange
The City of Westlake is proposing to complete the I-90/SR 252 (Columbia Road) Interchange Reconfiguration project by reconstructing the westbound side of the interchange. The eastbound side was reconstructed in 2017 as project CUY-90-3.56, PID 88665. This project (CUY-90-3.56 WB, PID) will fulfill the city's commitment to complete the reconstruction of the entire interchange.
The proposed project consists of consolidating traffic and reconfiguring intersections within the interchange. The intersection of Sperry Road/SR 252 would be reconfigured and the westbound I-90 exit ramp to northbound SR 252 would be removed. Traffic would then be combined on the loop ramp for the westbound I-90 exit to southbound SR 252. The loop ramp will be widened to two lanes and will intersect SR 252 opposite of Sperry Road. This reconfiguration will combine two closely-placed signalized intersections into one.
Due to increased traffic volumes for the entrance ramp from northbound SR 252 to the westbound I-90 entrance ramp, a dual left turn lane will be provided and the entrance ramp widened to two lanes.
All improvements will be completed within the exiting right of way. No additional property will need to be acquired.
This $4,300,000 construction project is expected to begin in late 2021. Questions and/or comments regarding the project may be submitted by Nov. 29, 2020, to Robert P. Kelly, Director of Engineering, City of Westlake, 27700 Hilliard Boulevard, Westlake, Ohio 44145. For further information or to submit formal comments, please contact the Westlake Engineering Department at (440) 617-4145. Comments may also be emailed to the Engineering Department at engdept@cityofwestlake.org.
Update (April 29, 2022): Beginning Monday, May 2, all drivers using the Westbound I-90 exit ramp at Columbia Road will share the Northbound exit ramp. Drivers wishing to head south may turn left at the top of the Northbound ramp and those heading north may turn right as usual. This traffic pattern will be in place through the Summer. Workers are scheduled to complete set-up for the new traffic pattern on Sunday, May 1 at 8 p.m., weather permitting.
Update (April 21, 2022): ODOT has pushed construction along Sperry Road near the I-90/SR 252 interchange to the first or second week of May. Sperry Road will be open to EASTBOUND TRAFFIC ONLY at Columbia Road. Westbound traffic will be directed to follow detour signs. This will be in effect for 28 days. The temporary closure of the westbound lane is in accordance with Phase 1 of this project. For more information about this project, contact the ODOT District 12 Public Information Office at 216-584-2006. Refer to the image below as well. This road closure was previously scheduled to begin April 14 but inclement weather necessitated a delay.
2021 Sidewalk Repair Program, Quadrant 1
The City of Westlake, Department of Engineering began the 2021 Sidewalk Repair Program in the southeast quadrant of the City, Quad 1, covering neighborhoods south of Hilliard Blvd. and east of Dover Center Road. If you live in this area you should have received notification by mail of any sidewalk violations needing replacement or repair. The goal of this program is to identify and address damaged portions of sidewalk for the sake of the general health of welfare of the community. The City’s Sidewalk Inspection Program was enacted in 2001 by Codified Ord. 905.08, which contains more details.
Bid Info: City Council approved DiGioia Suburban as low bidder on Thursday, October 7, 2021. Please see our Bid Tabs for more details.
Update: Residents of Quadrant 1, should look for a Yellow Post Card in the mail. We will be starting the removal and replacement in this area mid to late April.
Please visit our interactive map to view updated information on the 2021 Sidewalk Repair Program.
Clague Park Playground Upgrade
1500 Clague Road, this Project will consist of many site improvements and new playground equipment.
Bid Info: The bid was opened on Tuesday, August 17, 2021 at 2:00 p.m. The contract has been awarded to Mr. Excavator Inc. by City Council on September 2, 2021. Please see our Bid Tabs for more details.
Update: Project is expected to be completed in May of 2022.
Lilly Weston House
The City has applied and obtained a grant from the Ohio Facilities Construction Commission, (OFCC Community Grant) to help fund the restoration. The work funded through this grant, along with some City funds, will include the following:
First Floor
- Framing, removal and rebuild of rotted materials
- New floor flooring only subflooring currently exists
Second Floor
- 1850's Section replacement of all rotted joists and subfloor.
- Remove circa 1960's stairs in a 1840's section:
- Reframe opening to match existing
- Relocate stairs to original location with construction of the era
- Correct hardwood staircase and railing
Outside Structure
- Structural roof repairs for the 1850 Section
- Masonry repairs
- Window replacement, only when too rotted to repair, using cypress, reclaimed glass where possible
- Construction of new period-appropriate front stoop with reclaimed sandstone to the 1840's Section
- Adding a ADA entry at recessed porch on 1850 Section, related A/E services.
Bid Info: The bid was opened on Tuesday, November 11, 2021 at 2:00 p.m. The contract has been awarded to R. W. Clark Co., Inc. by City Council in 2022.
Update:
Sanitary Sewer Improvements
The Engineering Department is in the process of examining Westlake’s citywide sanitary sewer system to identify and address problems and collect data. Common issues that workers look for include water inflow or infiltration issues that can lead to flooding.
Update: Bassett Rd Hilliard Blvd to Dover Center Rd- USI will be in this area lining and filming sanitary lines and manholes
New Tennis Courts
This project is the reconstruction of the tennis courts at the Westlake Recreation Center Park that were removed to make room for the new Westlake Center for Community Services. This new four tennis court complex will be more assessable to the general public with parking adjacent to the courts.
Bid Info: The bid was opened on July 13, 2021 at 2:00 p.m. The contract has been awarded to Infinity Paving, by City Council on July 15, 2021. Please see our Bid Tabs for more information.